• connect@mhura.org
Facebook-f Instagram
  • Home
  • Who We Are
  • Join Us
  • Events
  • Current Initiatives
    • Upcoming Municipal Election 2025
    • Saamis Solar Project (SSP)
    • Transportation Master Plan (TMP)
    • City of Medicine Hat: MCAF NEEDS TO GO!!
    • Municipally Controlled Corporation (MCC)
    • Reduced and Fair Utility Costs
  • Past Initiatives
    • Return of Overcharged Utility Rates
  • Contact Us
  • Home
  • Who We Are
  • Join Us
  • Events
  • Current Initiatives
    • Upcoming Municipal Election 2025
    • Saamis Solar Project (SSP)
    • Transportation Master Plan (TMP)
    • City of Medicine Hat: MCAF NEEDS TO GO!!
    • Municipally Controlled Corporation (MCC)
    • Reduced and Fair Utility Costs
  • Past Initiatives
    • Return of Overcharged Utility Rates
  • Contact Us
Current Initiatives

Reduced and Fair Utility Costs

  • Updated on September 20, 2025
  • by Mhura

COMING SOON

Documents

  • Mhura Utility Charge Handout
  • MHURA Double Charges
Tags: Current initiatives
Share:

Post navigation

Previous Post Previous post:
Return of Overcharged Utility Rates
Next Post Next post:
Municipally Controlled Corporation (MCC)

CONTACT US

  • 1111 Kingsway Ave SE
    Medicine Hat, AB T1A 2Y1
  • Email: connect@mhura.org
  • 403.526.4872
Facebook-f Instagram

Links

  • Who We Are
  • Events
  • Current Initiatives
  • Past Initiatives

Links

  • Contact Us
  • Join Us
  • Donate

Gallery

© All right reserved {Year} Mhura